FRANKI CONSTRUCT - NEMO 33

  • Sinking a 1,200 ton shaft more than 40m deep and in total absence of visibility.
  • 8 months of construction. 670 hours of diving.
  • Dives with oxygen-enriched respirable mixtures
  • Bentonite dives
  • Demolition of sediments with an ultra-high pressure lance (2000 bars)
  • Hydraulic drilling and coring
  • Blasting with commercial explosives and pyrotechnic cartridges
  • Pumping and cleaning of sediment
  • Inspections and bathymetric surveys
  • Installation of reinforcement and concreting
  • Various finishing works

TRALUX DENYS

  • Cleaning and preparation of 600 welds in the pipes of a dam.
  • Quality control using a roughness meter
  • Application of epoxy paint
  • 5 weeks of work in confined and vertical spaces
  • Detailed reports of the work carried out for each weld

EXELIO

  • Emergency intervention in wastewater treatment plant
  • Recovery of an agitator in an aeration basin
  • Inspection of submersible pumps in a steel mill

HOLCIM

  • Underwater maintenance work on a floating pumping station
  • Change of check valves
  • Installation and removal of cuffs
  • Maintenance of submersible pump strainers

ENGIE-COFELY

  • Access inspection on ropes of technical ducts 80m high
  • Asbestos environment
  • PVC HVAC pipe repairs

INFRABEL

  • Inspection of submerged parts of railway bridge piers
  • Inspections by divers, ROV and echo sounder bathymetry
  • Clearing and inspection of submerged underpasses
  • Stabilization of a bridge pier by concrete injections

SODRAEP

  • Installation of an atmospheric box to allow large diameter coring in a quay wall
  • Study and production of the box in our workshops
  • Installation of the box and waterproofing
  • Removal of the box at the end of the work

TOTAL PETROCHEMICALS

  • Sealing of a cooler basin
  • Sludge pumping
  • Construction and installation of a stainless steel grease barrier

SERVICE PUBLIC DE WALLONIE

  • Repair of pontoons
  • Production of aluminum boxes and stainless steel reinforcements
  • Underwater inspection of pontoons

GOURMAND PASTRIES

  • Complete inspection of a fire tank by ROV
  • Changing a pressure gauge by a diver
  • Report on plans and video editing

APERAM

  • Clogging of a 1500mm pipe
  • Intervention in confined underwater space
  • Automated maintenance of shutter pressure for 4 weeks
  • Very high pressure cleaning of submerged pipes
  • Construction and installation of a removable stainless steel grille

PRAYON

  • Inspection and unblocking of a valve
  • Inspection of a detailer and a DN 1000 pipe
  • Emergency intervention

IN'BW

  • Pumping of tow in biological pond
  • Pumping with vacuum truck
  • Installation of agitator masts

ENGIE-COFELY

  • Inspection and mechanical interventions on the movable floor of an Olympic swimming pool
  • Use of fully degreased hydraulic cylinders and pneumatic tools

Raffinerie Tirlemontoise/ Tiense Rafinaderij

  • Installation and removal of 3.5 ton aerator motors
  • Installation of shutters
  • Cleaning of outfalls and removal of ice jams
  • Flange coupling

HARSCO

  • Surface bathymetry of a 350m long dock
  • Confirmation by diver and removal of obstacles to navigation

SUEZ

  • Intervention in biological aerator basin
  • Pumping of sludge to release the aerators
  • Advice for optimizing the industrial water treatment system
  • Installation of agitator supports

SUEZ

  • Intervention in aerator basin on the SANOFI-GENZYME pharmaceutical site
  • Attaching an oxygen sensor holder
  • Stabilization of an aerator motor

NEMO 33

  • Taking soil samples at a depth of 35m
  • Study to assist in sinking a 1,200 ton shaft
  • Miscellaneous finishing work

CZAR Production

  • Filming of an advertisement made in a spa on the outskirts of Brussels.
  • Figuring and implementing diving equipment.