Achievements FRANKI CONSTRUCT - NEMO 33 Sinking a 1,200 ton shaft more than 40m deep and in total absence of visibility. 8 months of construction. 670 hours of diving. Dives with oxygen-enriched respirable mixtures Bentonite dives Demolition of sediments with an ultra-high pressure lance (2000 bars) Hydraulic drilling and coring Blasting with commercial explosives and pyrotechnic cartridges Pumping and cleaning of sediment Inspections and bathymetric surveys Installation of reinforcement and concreting Various finishing works TRALUX DENYS Cleaning and preparation of 600 welds in the pipes of a dam. Quality control using a roughness meter Application of epoxy paint 5 weeks of work in confined and vertical spaces Detailed reports of the work carried out for each weld EXELIO Emergency intervention in wastewater treatment plant Recovery of an agitator in an aeration basin Inspection of submersible pumps in a steel mill HOLCIM Underwater maintenance work on a floating pumping station Change of check valves Installation and removal of cuffs Maintenance of submersible pump strainers ENGIE-COFELY Access inspection on ropes of technical ducts 80m high Asbestos environment PVC HVAC pipe repairs INFRABEL Inspection of submerged parts of railway bridge piers Inspections by divers, ROV and echo sounder bathymetry Clearing and inspection of submerged underpasses Stabilization of a bridge pier by concrete injections SODRAEP Installation of an atmospheric box to allow large diameter coring in a quay wall Study and production of the box in our workshops Installation of the box and waterproofing Removal of the box at the end of the work TOTAL PETROCHEMICALS Sealing of a cooler basin Sludge pumping Construction and installation of a stainless steel grease barrier SERVICE PUBLIC DE WALLONIE Repair of pontoons Production of aluminum boxes and stainless steel reinforcements Underwater inspection of pontoons GOURMAND PASTRIES Complete inspection of a fire tank by ROV Changing a pressure gauge by a diver Report on plans and video editing APERAM Clogging of a 1500mm pipe Intervention in confined underwater space Automated maintenance of shutter pressure for 4 weeks Very high pressure cleaning of submerged pipes Construction and installation of a removable stainless steel grille PRAYON Inspection and unblocking of a valve Inspection of a detailer and a DN 1000 pipe Emergency intervention IN'BW Pumping of tow in biological pond Pumping with vacuum truck Installation of agitator masts ENGIE-COFELY Inspection and mechanical interventions on the movable floor of an Olympic swimming pool Use of fully degreased hydraulic cylinders and pneumatic tools Raffinerie Tirlemontoise/ Tiense Rafinaderij Installation and removal of 3.5 ton aerator motors Installation of shutters Cleaning of outfalls and removal of ice jams Flange coupling HARSCO Surface bathymetry of a 350m long dock Confirmation by diver and removal of obstacles to navigation SUEZ Intervention in biological aerator basin Pumping of sludge to release the aerators Advice for optimizing the industrial water treatment system Installation of agitator supports SUEZ Intervention in aerator basin on the SANOFI-GENZYME pharmaceutical site Attaching an oxygen sensor holder Stabilization of an aerator motor NEMO 33 Taking soil samples at a depth of 35m Study to assist in sinking a 1,200 ton shaft Miscellaneous finishing work CZAR Production Filming of an advertisement made in a spa on the outskirts of Brussels. Figuring and implementing diving equipment. OCTO DIVING S.P.R.L. (Ltd) VAT: BE0679.998.110Rue J.J. Merlot, 54P 5060 – Sambreville – BelgiumMobile 24/7: +32 477 88 70 56info@octo-diving.com